National Oceanic Atmospheric Administration (NOAA) Building 1 Generator Upgrade

Overview

This project is currently in progress but involves electrical engineering support to replace the existing generator and three automatic transfer switches (ATS’s) for one of the buildings at the NOAA Western Region Center in Seattle, WA.  The project involves updating existing electrical drawings to show the emergency system and new equipment, provide load calculations to verify new generator with existing and new loads, review of electrical equipment submittals and an on-site inspection of the electrical system.

Challenges/Solution

Project currently in progress.

Results

Project currently in progress.

Back to Projects

Project Details

CLIENT

Ahtna

PROJECT TYPE

Electrical Engineering Design

LOCATION

Seattle, WA

COST/SIZE

$17,200